Triathlon CHU Amiens

Association Triathlon CHU Amiens : le but de cette association est de développer le triathlon au sein de l’hôpital, par la mise en place d’entraînements , de compétitions, et l’organisation d’épreuves pour les hospitaliers.

Aucune note. Soyez le premier à attribuer une note !

Commentaires (1)

1. Auth 27/04/2012

Near-Zero CO2 PlanAll our power requirements are for lintihgg, heating, transport, and energy for such things as industry on down to exercise machines. The lintihgg can be zero rated by building Buxton Geothermal Power Stations (BGTGs) which use the heat of the earth at depth by drilling ten kilometre deep holes.The heating can be near-zero rated by installing Starlite coatings, which can prevent heat leaks, on the walls and ceilings of all premises.Transport can be made near-zero in terms of carbon emissions by ensuring that all vehicles use BGTG electricity.The carbon footprints of long range transport can be at least halved by having their fuels mixed permanently with water using an ultrasonic dibber. Finally, the power needed for energy can be made entirely of BGTG electricity. Mental illness costs the UK a3100 billion per year, enough for the plan. The Kadir-Buxton Method can cure the ill in thirty seconds for free.Reducing CO2 Levels Already CreatedBy creating as much biochar as possible we can take CO2 out of the atmosphere and oceans and store it safely in the soil. What we need is central planning, none of this will get done by the market which is obsessed by profits rather than results.

Ajouter un commentaire